Vincent Breton-Provencher, PhD

Assistant professor at the department of Psychiatry and Neuroscience of Université Laval and researcher at CERVO Brain Research Centre. He did his postdoc in the lab of Dr. Mriganka Sur at MIT where he studied the role of noradrenaline in brain states and learned behaviors. He received his PhD in Neurobiology and his BSc in Physics Engineering from Université Laval. He loves collecting records. CV
Joël Boutin, PhD

Research Scientist, Joël received his PhD in Cellular and Molecular Biology from Université Laval. He previously worked in the labs of Drs Ryczko and Bentzinger at Université de Sherbrooke.
Emmeraude Tanguay, MSc

PhD Student, Neuroscience. Emmeraude graduated from the BSc program in Neuroscience from Université de Montréal. She joined the lab in May 2022 to study the effect of neuromodulator system on cortical networks.
Camille Balazuc, MSc

PhD Student in Neuroscience. Camille graduated from the Master of Neuroscience program at Université Lyon 1. She joined the lab in January 2024 during an internship and began her PhD in September 2024. She is studying the impact of norepinephrine on motor learning.
Johanna Abdallah, MSc

PhD Student in Neuroscience. Johanna graduated from the Master of Translational Medicinal Chemistry, of Montpellier University. She joined the lab in April 2026 to study the how at the molecular a neurotransmitter like Noradrenaline help to integrate visual information in the dorsal Lateral Geniculate Nucleus of the thalamus.
Jordan Charest, MSc

PhD Student in Biophotonics. Jordan graduated from the MSc program in Physics at Université Laval. They began their PhD in the lab in January 2026 to study how neuromodulation and arousal shape brain networks.
Sambre Mach, PhD

Francis Bernard, MSc

PhD Student in Medical Physics. Francis graduated from the BSc program in Physics at Université Laval. He joined the lab in May 2025 as a Master Student to study how noradrenaline may affect neurovascular coupling in the cortex and began his PhD
Mélodie Tremblay

BSc student in Biomedical Sciences at Laval University. As part of a summer research internship, Mélodie joined the lab in May 2025 to investigate the impact of prefrontal dopamine release on learning processes and adaptive behavior.
Lab alumni
- Mélodie Tremblay, Undergraduate Student, Sciences Biomédicales, Université Laval (June 2025-August 2025)
- Sandrine Poulain, Master’s Student in Biophotonics, Université Laval (May 2023-September 2025)
- Maëlis Fixot, Master’s Student from the Neurasmus program (April 2026-May 2026)
- Liva Araka, Master’s Student from the Neurasmus program (November 2025-December 2026)
- Antoine Frenette, BSc student, Engineering Physics, Université Laval (September 2025-November 2025)
- Julianne Fréchette, Undergraduate Student, Bio-informatique, Université Laval (June 2025-August 2025)
- Valérie Duclos-Phan, Undergraduate Student, Génie Physique, Université Laval (June 2025-August 2025)
- Julien Poitreau, Postdoctoral researcher (April 2024 – May 2025)
- Gabrielle Germain, Master’s Student in Medical Physics (May 2023-May 2025)
- Antoine Daigle, Master’s Student in Biophotonics (May 2023-May 2025)
- Gabriel Davila, Undergraduate Student, Sciences Biomédicales, Université Laval (September-October 2024)
- Sarah-Julie Bouchard, Master’s Student in Neuroscience (January 2022-September 2024)
- Lori Hazel, PhD Student in Neuroscience (June 2024-November 2024)
- Airton Sinott, Master’s Student from the Neurasmus program (September 2024-October 2024)
- Morgane Ruffel, Master’s Student from the Neurasmus program (September 2023-June 2024)
- Marie-Pier Foster, Undergraduate Student, Sciences Biomédicales, Université Laval (September 2023-April 2024)
- Juliette Bourgeois , Undergraduate Student, Biology, Université Laval (June-August 2023)
- Inès Istre, Master’s Student in the Neurosciences Moléculaires, Cellulaires et Intégrées Program at Université de Rouen in France (March-June 2023)
- Catherine Desbiens, Undergraduate Student, Sciences Biomédicales, Université Laval (January-April 2023)
- Léa-Maude Gauthier, NSERC Undergraduate Student, Neuroscience, Université de Montréal (May-August 2022)
- Sabrina Juhasz, Undergraduate Student, Sciences Biomédicales, Université Laval (September-November 2021)
- Brandon Martel, Undergraduate Student, Sciences Biomédicales, Université Laval (Summer 2021)
Timeline

